Skip to content
SC
SC JoineryJoiners · Southport
Exterior joinery

Decking in Southport.

Hardwood, softwood and composite decks - properly framed.

From
£2,400 small deck
Typical time
3-7 days
Lead time
4-6 weeks
Guarantee
12 months workmanship

A proper deck extends your living space outdoors, looks better than pavers or gravel in most garden settings, and - fitted on a well-drained sub-base - lasts 20+ years. I've been building timber and composite decks across Southport for over fifteen years and the same basic principles apply whether it's a 12m² patio deck or a 60m² wraparound.

Timber vs composite - the lifetime cost question

Pressure-treated softwood decking (typically Scandinavian redwood, treated to Use Class 3 or 4) is the cheapest option at install - around £95/m² including sub-frame and labour - but needs oil or preserve every 12-18 months and boards typically last 12-15 years before needing replacement.

Hardwood decking (iroko, balau, ipe) is the premium option - £180/m² fitted - and lasts 25+ years with minimal maintenance. The timber silvers to a grey if left, or can be oiled annually to keep the warm brown. Looks spectacular in contemporary gardens.

Composite decking (Trex, Millboard, Saige) is the fast-growing segment - £140/m² fitted - and needs essentially zero maintenance, never rots, never splinters, resists mould. The downside: it looks like composite up close (though at arm's length very convincing). My personal top pick is Millboard - the texture and colour variation is the most natural-looking I've seen.

For a 30m² back garden deck in Southport, over 20 years, the total cost per square metre (install + maintenance + eventual replacement) actually ends up similar across all three. Pick based on the look you want and how much maintenance you're willing to do.

The sub-frame - where decks live or die

I see failed decks every month where the fault was the sub-frame, not the boards. Common mistakes: joists too far apart (should be 400mm centres max for softwood, 350mm for composite), posts sitting on soil not concrete pads, no ventilation gap underneath (fatal - traps moisture, rots everything), board-to-joist screws not stainless so they rust out in three years.

My standard deck build: concrete pad footings every 1.5m, 100x100mm tanalised posts, 150x50mm bearers, 150x50mm joists at 400mm centres, all fixed with twin-coated decking screws and stainless board screws. The whole sub-frame sits 150mm clear of soil or grass for ventilation, and I membrane-lay the ground below to stop weeds coming through the gaps.

For raised decks (over 300mm above ground) I install ballast board around the edges for structural stability, and run cross-bracing on posts over 900mm tall. For decks built against the house I install a waterproof membrane at the house wall to prevent water ingress.

Balustrade, steps and integrated features

Decks over 600mm need a balustrade by building regs - 1100mm tall, with gaps no greater than 100mm. I'll typically build timber spindle balustrade to match the deck, or toughened glass panel balustrade for unobstructed views - particularly popular on elevated decks with a sea view over to Ainsdale or Hightown.

Steps need proper tread height (typically 170-200mm), nosings, and a consistent run - I use a stair gauge rather than eye-balling it. Wider steps (1.2m+) look much better than the narrow 900mm flights you see on DIY jobs.

Integrated features I regularly build in: LED edge lighting at the step nosings and perimeter; built-in bench seating running along one edge (doubles as storage); pergola posts positioned and tied into the deck structure from day one (so you can add a pergola later without fuss); hot-tub cut-outs with reinforced joists and drainage.

What’s included

Every decking job covers the lot.

One quote, one invoice, one point of contact. No hidden extras - if it’s needed to finish the job properly, it’s in the price.

4.9/5 from 96 Southport reviews
  • Site survey and levels
  • Concrete foundations for posts
  • Pressure-treated subframe at 400mm centres
  • Composite, hardwood or treated softwood boards
  • Balustrades and handrails
  • Steps to existing patio or lawn
  • Skirt boards to hide the subframe
  • Post caps or LED downlights option
How it works

From first phone call to final tidy-up.

No mystery, no middle-men. Here’s exactly what happens when you hire us.

  1. 01

    Garden visit

    Measure, assess drainage, photograph, discuss material preferences.

  2. 02

    Quote & drawings

    Fixed price, scaled plan, material specification.

  3. 03

    Build

    Strip back, level, sub-frame, boards, balustrade, steps - typically 3-7 days.

  4. 04

    Finish

    Final oil (softwood) or clean-down (composite/hardwood). Tidy up, walk the job.

Pricing

Clear, fixed-price quotes for every job.

Most decking jobs are quoted as a fixed price after a free site visit. No surprises, no stage payments on small jobs - 30% deposit to secure the slot, balance on completion.

Free site visit & written quote
Fixed price (no surprise extras)
Pay deposit by card or bank transfer
No VAT charged
Decking
From£120
per m² · typical job 3-7 days

Try the instant quote calculator for a ballpark, or request a site visit for a firm, written price.

Decking FAQs

Decking - your questions answered.

Common questions about decking in Southport. Still curious? Call Sam on 07899 955187.

Composite (e.g. Trex, Millboard) looks great, doesn't splinter, doesn't need staining, and lasts 25+ years - but costs double. Softwood is the best budget choice but needs annual oil/stain. Hardwood like iroko is premium-looking and long-lived but expensive. For families with kids I usually recommend composite.

Treated softwood decking, including frame: around £120/m². Composite decking including frame: £180-£230/m² depending on the board brand. For a typical 4m × 4m deck (16m²) you're looking at £2,000 softwood or £3,200 composite, all in.

If the deck is under 300mm from ground level, no. If it's raised (over 300mm), yes - you'll need permission. Most rear garden decks are fine. If your garden slopes and the deck ends up raised, I'll flag it before we start.

Ready to book your decking job?

Free quote, no obligation. Most decking jobs quoted within 24 hours.